Society NOCs, and the work that quietly needs one

Three categories of work stop a project mid-flight.

Society NOCs, and the work that quietly needs one

Wet areas, façade openings and anything structural. Those are the three that will get a project halted by a housing society, usually after material is already on site.

Moving a bathroom or kitchen changes the drainage stack loading and often the waterproofing responsibility for the flat below. Most societies require written permission and some require a plumber on their panel. Get it in writing before demolition, not after.

Façade changes — grilles, window replacements, air-conditioner positions — are frequently governed by a uniformity rule nobody mentions until you breach it.

Structural work is the serious one. Removing or coring a wall in a load-bearing or shear-wall building is not a permissions problem, it is a safety problem, and it needs a structural engineer's certificate rather than an assurance from a contractor.

Get it in writing before demolition, not after.

Build your bill of quantities

Read next

More on this.

What a fit-out actually costs, line by lineCost

What a fit-out actually costs, line by line

Quotes get compared on totals and won on omissions.

Cost · 11 min
Stone that survives an Indian summerMaterials

Stone that survives an Indian summer

Thermal movement, sealing cycles, and the west façade problem.

Materials · 7 min
The drawings you need before you call a contractorProcess

The drawings you need before you call a contractor

A quote against a sketch is a guess with a number attached.

Process · 6 min