Interior designer, contractor, or both?

They solve different problems, and hiring the wrong one for your project is the expensive mistake.

Interior designer, contractor, or both?

A contractor builds what is drawn. A designer decides what should be drawn. If you already know the layout, the materials and the details you want, a good contractor and a clear drawing set will execute it for less than a design-build package.

If you do not — if the questions still open are where the kitchen should go, how the storage works, or what the flat should feel like — then hiring a contractor first means those decisions get made on site by whoever is standing there, which is how homes end up looking assembled rather than designed.

Design-build firms bundle both and sell convenience, which is real. The trade-off is that the person specifying the material and the person profiting from it are the same, so ask how the material is priced and whether you can see the invoices.

Whichever you pick, the leverage is the same: a dimensioned drawing set and a quantity schedule before anyone quotes. Three quotes against your schedule are comparable. Three quotes against three different scopes are not a comparison at all.

A contractor builds what is drawn. A designer decides what should be drawn.

Build your bill of quantities

Read next

More on this.

The drawings you need before you call a contractorProcess

The drawings you need before you call a contractor

A quote against a sketch is a guess with a number attached.

Process · 6 min
Home lifts: the questions to ask before the shaft is castProcess

Home lifts: the questions to ask before the shaft is cast

Almost every regret about a home lift is a decision made after the structure was poured.

Process · 7 min
Switches and sockets: count them before the walls closeProcess

Switches and sockets: count them before the walls close

Nobody has ever finished a house wishing they had fewer sockets.

Process · 6 min